Page 1 | Page 2 | Page 3 | Home

These prices are for estimating purposes only and are subject to change without notice.
List prices are subject to substantial discounts based on quantities and location.
Please contact us for firm pricing.

Manholes ASTM C-478 & Components
24" x 4'-0" Catchbasin with Base * 201.95 each
24" Catchbasin Extension *   37.55 / V.Ft.
24" Integral Base 51.75 each
24" x 3'-3" x 6" Heavy Wall Inlet w/channel 256.00 each
24" x 4'-0" HW Catch Basin w/Base (MDOT) 256.00 each

36" x 44" Catchbasin with Base * 296.48 each
36" Catchbasin Extension *   58.70 / V.Ft
36" Integral Base 81.25 each
36" x 6" to 24" Catchbasin Top 100.05 each

48" Manhole - Rubber Joint * 58.60 / V.Ft.
48" Manhole - Plain Joint * 53.50 / V.Ft.
48" Integral Base 133.33 each
48" Flow Channel 166.70 each
48" x 1'-0" to 24" MH Reducer 172.70 each

60" Manhole - Rubber Joint * 132.45 / V.Ft.
60" Manhole - Plain Joint * 120.95 / V.Ft.
60" Integral Base 263.20 each
60" x 2'-8" to 48" MH Reducer 132.45 / V.Ft.
60" x (1'-0" or 1'-5") to (24" or 48") MH Reducer 373.50 each

72" Manhole - Rubber Joint * 198.00 / V.Ft.
72" Manhole - Plain Joint * 177.65 / V.Ft.
72" Integral Base 374.70 each
72" x 2'-8" to 48" MH Reducer 198.00 / V.Ft.
72" x (1'-0" or 1'-5") to (24" or 48") MH Reducer 611.20 each

84" Manhole - Rubber Joint ** 298.60 / V.Ft.
84" Manhole - Plain Joint ** 261.05 / V.Ft.
84" Integral Base 490.00 each
84" x 1'-5" to (24" or 48") MH Reducer 994.00 each

96" Manhole - Rubber Joint ** 353.40 / V.Ft.
96" Manhole - Plain Joint ** 318.35 / V.Ft.
96" Integral Base 641.00 each
96" x 1'-5" to (24" or 48") MH Reducer 1253.00 each

120" Manhole - Rubber Joint ** 462.00 / V.Ft.
120" Manhole - Plain Joint ** 427.35 / V.Ft.
120" Integral Base 1006.00 each
120" x 1'-5" to (24" or 48") MH Reducer 1931.00 each
144" Manhole - Rubber Joint ** 561.45 / V.Ft.
144" Manhole - Plain Joint ** 509.35 / V.Ft.
144" Integral Base 1300.00 each
144" x 12" to (24" or 48") MH Cover 2872.00 each

Manhole Openings
  * Add $10.00/V.Ft. for Plain Openings in Storm MH's
** Add $25.00/V.Ft. for Plain Openings in Storm MH's

Block Manholes & Catchbasins
44" x 8" Manhole Base 86.00 each
48" x 8" Manhole Base 110.00 each
60" x 8" Manhole Base 130.00 each
66" x 8" Manhole Base 160.00 each
72" x 8" Manhole Base 190.00 each
84" x 8" Manhole Base 259.00 each
96" x 8" Manhole Base 339.00 each
108" x (8" or 10") Manhole Base 536.00 each
114" x 10" Manhole Base 598.00 each
120" x 10" Manhole Base 770.00 each
154" x (10" or 12") Manhole Base 1170.00 each

24" x 2' x 6" Sump 140.00 each
36" x 2' x 6" Sump 200.00 each
48" x 2' x 6" Sump 266.70 each
48" x 2' x 8" Sump 300.00 each

48" x 8" to 24" MH Cover - 58" O.D. 175.00 each
60" x 8" to 24" MH Cover - 72" O.D. 290.00 each
72" x 8" to 24" MH Cover - 86" O.D. 428.00 each
84" x 10" to 24" MH Cover - 102" O.D. 616.00 each
96" x 12" to 24" MH Cover - 114" O.D. 973.00 each

Accessories & Options
Bolt Down Assembly 53.35 / mh
˝" Pipe and Cap 33.35 / mh
Adjusting Rings 11.00 / V.in.
Kor-N-Seal or A-Lok
(Min Charge $60.00)
10.00 /in.Dia.
Add $250.00 for Structures Larger than 72"
or Offset Connections

Prices Quoted on Request for:
  • Pipe to meet other specifications
  • Larger Diameter Pipe - either round or elliptical
  • Manhole and Catchbasin Castings
  • Pipe Gaskets and Joint Lubricant
  • Curve Pipe
  • Fittings
  • Rectangular Wet Wells - where extra large capacity is needed
  • Precast Reinforced Concrete Box Sections ASTM C-1433 and ASTM C-1577
  • Mini-Bridge Precast Bridge Sections
  • Maxi-Bridge Long Span Box Culvert Sections
  • Hy-Span - 3 Sided Bridge
  • Northern Arch - 3 Sided Arch Bridge
  • PVC Pipe & Fittings
  • Anti-Hydro Products
  • Speed Crete Products
  • Other Concrete Specialties
  • Above Ground Fuel Storage Tanks
  • Precast Buildings with Exposed Aggregate
Delivery
The above prices apply F.O.B. tailgate of truck in truckload lots to the nearest accessible point of job site which our motor truck can reach under its own power. ONE HOUR is the maximum time allowed for unloading of truck - after that, a service charge of $200.00 per hour will be made for truck delayed on a job site, up to $500 per load. Less than truckload lots delivered at $3.00/mi., each way.

Terms
Payment terms are cash - due net in the month following the month of delivery and will be referred to in billing as net 30th. If payment has not been received by the end of the second month following the month of delivery the account will be considered past due and shall be subject to a SERVICE CHARGE of one and one-half percent (1˝%) per month thereafter on the unpaid balance representing a TIME-PRICE DIFFERENTIAL pursuant to MSA§ 19.15 (1). This amounts to an ANNUAL PERCENTAGE RATE of 18% per year. Cash discounts when applicable are allowed providing buyer's entire account with seller is current. Our standard terms and conditions will apply to your purchase and will be furnished to you when our quotation or order (acknowledgement) is submitted to you, or upon your request.


Page 1 | Page 2 | Page 3 | Home