Page 1 | Page 2 | Page 3 | Home

These prices are for estimating purposes only and are subject to change without notice.
List prices are subject to substantial discounts based on quantities and location.
Please contact us for firm pricing.

Manholes ASTM C-478 & Components
24" x 4'-0" Catchbasin with Base * 250.00 each
24" Catchbasin Extension *   50.00 / V.Ft.
24" Integral Base 50.00 each
24" x 3'-3" x 6" Heavy Wall Inlet w/channel 275.00 each
24" x 4'-0" HW Catch Basin w/Base (MDOT) 275.00 each

36" x 44" Catchbasin with Base * 325.00 each
36" Catchbasin Extension *   60.00 / V.Ft
36" Integral Base 75.00 each
36" x 6" to 24" Catchbasin Top 125.00 each

48" Manhole - Rubber Joint * 78.00 / V.Ft.
48" Manhole - Plain Joint * 78.00 / V.Ft.
48" Integral Base 145.00 each
48" Flow Channel 195.00 each
48" x 1'-0" to 24" MH Reducer 190.00 each

60" Manhole - Rubber Joint * 135.00 / V.Ft.
60" Manhole - Plain Joint * 135.00 / V.Ft.
60" Integral Base 270.00 each
60" x 2'-8" to 48" MH Reducer 135.00 / V.Ft.
60" x (1'-0" or 1'-5") to (24" or 48") MH Reducer 325.00 each

72" Manhole - Rubber Joint * 195.00 / V.Ft.
72" Manhole - Plain Joint * 195.00 / V.Ft.
72" Integral Base 350.00 each
72" x 2'-8" to 48" MH Reducer 195.00 / V.Ft.
72" x (1'-0" or 1'-5") to (24" or 48") MH Reducer 700.00 each

84" Manhole - Rubber Joint ** 295.00 / V.Ft.
84" Manhole - Plain Joint ** 295.00 / V.Ft.
84" Integral Base 525.00 each
84" x 1'-5" to (24" or 48") MH Reducer 1000.00 each

96" Manhole - Rubber Joint ** 435.00 / V.Ft.
96" Manhole - Plain Joint ** 435.00 / V.Ft.
96" Integral Base 625.00 each
96" x 1'-5" to (24" or 48") MH Reducer 1270.00 each

120" Manhole - Rubber Joint ** 530.00 / V.Ft.
120" Manhole - Plain Joint ** 530.00 / V.Ft.
120" Integral Base 1475.00 each
120" x 1'-5" to (24" or 48") MH Reducer 1945.00 each
144" Manhole - Rubber Joint ** 775.00 / V.Ft.
144" Manhole - Plain Joint ** 775.00 / V.Ft.
144" Integral Base 2125.00 each
144" x 12" to (24" or 48") MH Cover 2780.00 each

Manhole Openings
  * Add $10.00/V.Ft. for Plain Openings in Storm MH's
** Add $25.00/V.Ft. for Plain Openings in Storm MH's

Block Manholes & Catchbasins
44" x 8" Manhole Base 115.00 each
48" x 8" Manhole Base 115.00 each
60" x 8" Manhole Base 145.00 each
66" x 8" Manhole Base 215.00 each
72" x 8" Manhole Base 215.00 each
84" x 8" Manhole Base 265.00 each
96" x 8" Manhole Base 365.00 each
108" x (8" or 10") Manhole Base 710.00 each
114" x 10" Manhole Base 800.00 each
120" x 10" Manhole Base 995.00 each
154" x (10" or 12") Manhole Base 1625.00 each

24" x 2' x 6" Sump 205.00 each
36" x 2' x 6" Sump 315.00 each
48" x 2' x 6" Sump 375.00 each
48" x 2' x 8" Sump 400.00 each

48" x 8" to 24" MH Cover - 58" O.D. 190.00 each
60" x 8" to 24" MH Cover - 72" O.D. 325.00 each
72" x 8" to 24" MH Cover - 86" O.D. 700.00 each
84" x 10" to 24" MH Cover - 102" O.D. 1000.00 each
96" x 12" to 24" MH Cover - 114" O.D. 1270.00 each

Accessories & Options
Bolt Down Assembly 50.00 / mh
˝" Pipe and Cap 30.00 / mh
Adjusting Rings 14.00 / V.in.
Kor-N-Seal or A-Lok
(Min Charge $85.00)
14.00 /in.Dia.
Add $250.00 for Structures Larger than 72"
or Offset Connections

Prices Quoted on Request for:
  • Pipe to meet other specifications
  • Larger Diameter Pipe - either round or elliptical
  • Manhole and Catchbasin Castings
  • Pipe Gaskets and Joint Lubricant
  • Curve Pipe
  • Fittings
  • Rectangular Wet Wells - where extra large capacity is needed
  • Precast Reinforced Concrete Box Sections ASTM C-1433 and ASTM C-1577
  • Mini-Bridge Precast Bridge Sections
  • Maxi-Bridge Long Span Box Culvert Sections
  • Hy-Span - 3 Sided Bridge
  • Northern Arch - 3 Sided Arch Bridge
  • PVC Pipe & Fittings
  • Anti-Hydro Products
  • Speed Crete Products
  • Other Concrete Specialties
  • Above Ground Fuel Storage Tanks
  • Precast Buildings with Exposed Aggregate
Delivery
The above prices apply F.O.B. tailgate of truck in truckload lots to the nearest accessible point of job site which our motor truck can reach under its own power. ONE HOUR is the maximum time allowed for unloading of truck - after that, a service charge of $200.00 per hour will be made for truck delayed on a job site, up to $500 per load. Less than truckload lots delivered at $3.00/mi., each way.

Terms
Payment terms are cash - due net in the month following the month of delivery and will be referred to in billing as net 30th. If payment has not been received by the end of the second month following the month of delivery the account will be considered past due and shall be subject to a SERVICE CHARGE of one and one-half percent (1˝%) per month thereafter on the unpaid balance representing a TIME-PRICE DIFFERENTIAL pursuant to MSA§ 19.15 (1). This amounts to an ANNUAL PERCENTAGE RATE of 18% per year. Cash discounts when applicable are allowed providing buyer's entire account with seller is current. Our standard terms and conditions will apply to your purchase and will be furnished to you when our quotation or order (acknowledgement) is submitted to you, or upon your request.


Page 1 | Page 2 | Page 3 | Home